Weekly Roadwork Report – TxDOT Atlanta District

    For Oct. 18-23, 2020

    Bowie County

     I-30 – From FM 989 to Arkansas State Line, widening highway. Reconstructing and widening highway. Eastbound traffic moved to the outside lanes.

    SH 8 – At Sulphur River, replacing bridges.

    SH 93 – Between US 82 and US 67, installing sidewalks.

    SH 98 – At Anderson Creek, replacing bridge. All traffic restricted to one lane with signal lights controlling traffic through work zone.

    Cass County

    SH 8 – At Sulphur River, replacing bridges.

      Harrison County

     US 59 – From FM 1997 to Marion County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

    SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.

    FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.

      Marion County

    US 59 – From 1.5 miles south of FM 2208 to Harrison County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

    Morris County

      SH 49  – From Titus County Line to FM 144, repairing and resurfacing highway.

    Panola County

    US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.

    US 59 (NE Loop) – From US 59 North to US 79 East, repairing and resurfacing highway.

    SH 315 – From West Loop in Carthage to Rusk County Line, installing safety end treatments on culverts.

    Titus County

      SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.

    More from News of the Ark-La-Tex

    Today's Weather

    • Texarkana, TX

      Heavy Rain

      High: 59°F | Low: 52°F